ALL Adds 770-USt Capacity Blue Beast to Fleet

 Sept. 28, 2021 - The “Blue Beast", an all-terrain crane with the industry’s largest lifting capacity on eight axles, made its debut recently on a project at a Veterans Administration Hospital in Cleveland, Ohio.

The newly delivered Liebherr LTM 1650-8.1, dubbed the “Blue Beast” for its cobalt blue paint job, performed its inaugural lift for ALL Erection & Crane Rental, the flagship branch of the ALL Family of Companies.

Introduced at Bauma in 2019, the LTM 1650-8.1 is Liebherr’s successor to the LTM 1500-8.1, the best-selling large crane ever.

It ups the ante with 770-USt capacity, exceeding its predecessor’s capacity by between 15% and 50%, depending on equipment package. Units are made-to-order, with ALL placing its order very early, enabling delivery in the second quarter of 2021.

Perfect Capacity for Job

The job at the VA hospital involved construction of a mechanical room and lifting six air handler sections. The crane was set up on the street and had to lift over another building to reach the work area. Its capacity was perfect for the job.

“Given where we had to set up the crane, higher-capacity machines wouldn’t have fit, and cranes small enough to fit couldn’t lift the necessary weight at that distance,” said Brian Meek, equipment specialist for ALL Crane.

One hallmark of the LTM 1650-8.1 is its ability to set up close to buildings and obstructions while safely maintaining its swing, going where possibly no all-terrain crane of its size could ever go before. Beside other features, this is also offered by the VarioBallast system, which provides high performance with a smaller ballast radius. Ballast radius can be infinitely adjusted between 21’ and 27.5’ using a simple hydraulic slewing mechanism.

In tight spaces, even with its back literally against a wall, it will still handle significant picks. It gives plant and facility managers a new way of thinking about how they maintain equipment and where they can install bigger pieces of equipment.

The LTM 1650-8.1 also has two telescopic boom lengths:177’ or 263’ with an easy changing system, adding great flexibility. The long-boom system is available when needed, and the short one reduces transport costs and setup time. The long-boom configuration is also ideal for long-reach, up-and-over applications, providing additional luffing jib strength – just like conditions encountered in the inaugural job.

Convincing from the Start

In this instance, it was rigged with 73’ of main boom and 287’ of luffing jib. It could easily handle the 17,000-lb. air handler sections, each 30’ long. The operator picked each section from a flatbed parked on the street, lifted, and swung over the adjacent building, and set each piece atop the target structure behind it.

“This lift is a perfect showcase for the capabilities of the LTM 1650-8.1,” said Meek. “It has the footprint of a 550-USt crane and packs the punch of a 770-USt crane. Its assembly is much smoother than even a typical 660-USt crane, which will save money on setup for customers in the long run. I’m excited to see what doors this crane will open to new kinds of jobs.” 